Client

Imperial College London

Main Contractor

8build

M&E Designer

Elementa

Services

Electrical, Fire Alarm & Security

Duration

28 weeks

Sector

Laboratory

During this project, we were to undertake the full refurbishment of the basement floor of the Sir Alexander Fleming building into new laboratory space. This project was particularly complex due to the CL3 laboratories in the centre core needing to be completely air tight. Elecro had a key influence in the design and engineering of practical solution which was successfully applied throughout the project.