Client
Imperial College London
Main Contractor
Lowe Build
M&E Designer
Troup Bywaters & Anders
Services
Electrical, Fire Alarm & Security
Duration
24 weeks
Sector
Listed Buildings

We carried out the refurbishment of 460 student accommodation apartments within the Willis Jackson, Holbein and Southwell Hall buildings. The works consisted of the partial strip out of the existing lighting, power, security, data and fire alarm installations and replacement with new throughout. The buildings are Grade 2 listed and all works had to be designed and installed with this in mind.