Client

Goldman Sachs

Main Contractor

Elecro Ltd

M&E Designer

Elecro Ltd

Services

Builders Works, Electrical, Mechanical

Duration

20 weeks

Sector

Infrastructure

The basis of the project consisted of replacing the two large gas boilers in the basement. The project required detailed planning and involved many stages: the demolition of a number of walls, creating a penetration through the basement car park floor to enable to boilers to be lowered into position, the safe disconnection and removal of the existing boilers, installation and safety checks of the new boilers, which included a new layout of pipework and the rebuilding of the basement area. The job required that we work to the high standards synonymous with Goldman Sachs and to a tight timeframe. We delivered on both counts.